top of page
Land & Sea Survey Company provided personnel to Andrews Survey Ltd as survey support to e.on during the mid-phase of Monopile foundation (MP) and Transition Piece (TP) installation at Rampion Offshore Windfarm. Dimensional Control Surveys of the MP/TP and deck cradles were conducted on the onboard the vessel and in the load-out yard. Precision loading, accurate navigation of the WTIV MPI Discovery and MP/TP placement and monitoring using GNSS and Total-Station were required throughout the installation process
e.on Rampion OWF

Referencing TS
Setting up TS reference

Lift
Lifting MP into upending frame

WTIV MPI Discovery
On location Rampion OWF

Referencing TS
Setting up TS reference
bottom of page